Warning: Declaration of MyWalker::start_el(&$output, $category, $depth, $args) should be compatible with Walker_Category::start_el(&$output, $data_object, $depth = 0, $args = Array, $current_object_id = 0) in /home/gvlco/public_html/gvl/wp-content/themes/GVL-theme/posttypes.php on line 1289
GVL Electro - Optimising Energy - page 2

Optimising Energy

Updations of Electrical systems at Industries in Karnataka

Posted on: January 8th, 2016 No Comments

Looking at Maintenance prevention Techniques/Electrical system safety and Reliability,the Electrical Power Distribution system at Auto components Industry ,reviewed to ensure Optimum utilization of plant capacity/ Personnel safety / minimize interruptions/ Flexibility of operations . Total Power distribution system of 4000kVA at 33/0.433kV with Multi sources , has been redesigned with latest Technology Switchgear to ensure

Read More →

DG set synchronization through PLC

Posted on: January 5th, 2016 No Comments

We are pleased to declare the successful commissioning of 2 nos of DG set ( 500 KVA & 380 KVA ) in synchronized and Automated load sharing mode through PLC for a continuous process plant . It will facilitate the seamless operations of the plant thus saving of wastage during power interuptions and rework .

Read More →

Top