Warning: Declaration of MyWalker::start_el(&$output, $category, $depth, $args) should be compatible with Walker_Category::start_el(&$output, $data_object, $depth = 0, $args = Array, $current_object_id = 0) in /home/gvlco/public_html/gvl/wp-content/themes/GVL-theme/posttypes.php on line 1289
GVL Electro - Optimising Energy

Optimising Energy

Introduction of Medium Voltage Switchgear panels

Posted on: June 21st, 2017 No Comments

GVL electro has successfully built Medium voltage switchgear panel integrated with L&T make 11kv Vacuum Circuit Breaker ?. The ?panel is to be used for Medium Voltage Motors ?Test bench ?application with two high voltage outputs, multiple ratio current transformer and Potential transfomer . GVL now has the capability to cater to Industry needs of

Read More →

GVL – Introduce new range of Panels.

Posted on: February 15th, 2017 No Comments

  GVL ?Electro ?introduces new range of ? Power Distribution ?Boards ?as?? ? “Portable ?Power ?Distribution ?Boards” ?,?One such panel has been manufactured for transfer ?of ?2000kw ?of power ?with a ?synchronising ?facility ?between two different ? ?sources of ?power ,– with?Customized ?Designs ? is now tested and ready? for ?despatch ?.??? ? ? ?

Read More →

GVL – Moves A step further

Posted on: September 2nd, 2016 No Comments

?Hitachi – Hirel ?has appointed ?GVL Electro Controls as ? Authorised Channel partner ?for Its ? ? ? ? ? ? ? ? ? ? Industrial Automation Products and systems like PLC, VFD, HMI and SCADA systems. 1. ?Maintain a good range of VFD in stock for your urgent needs. We do take sales and

Read More →

Solar Plant ACDB

Posted on: June 4th, 2016 No Comments

GVL ?Electro ?is now aggressively increasing its ?participation in development of Solar power plant and ?Its AC side ?Power distribution up to the user point .These ACDB built with ?all ?cares and customized as per Environment conditions/ Electric power conditions / Specific Plant Engineering Following ?is a ?show case ?ACDBs? for ?Solar power plants of

Read More →

Turnkey Project

Posted on: April 9th, 2016 No Comments

A Turnkey project in a Brown Field for Auto Ancillary unit , Receipt 4000 KVA Power at 33Kv ?and transfer / distribute to Shopfloor at 415 volts is under execution at Dharwad. Design of Technical specifications , Manufacture , Supply , Erection and commissioning of complete Electric Power ?scheme at site, to make it convenient

Read More →

Electrical System Audit

Posted on: March 28th, 2016 No Comments

Maharashtra State Co-operative Bank ?ltd ?has ?hired the services ?of Energy Cell ?of ?GVL Electro Controls ?. The MSC Bank serves as a balancing center for the surplus resources of co-operatives in the state and thereby ensures their multifaceted development and prosperity. ?MSC Bank is the biggest co-operative bank in the country.?MSC Bank ?has got

Read More →

SAVE ENVIRONMENT

Posted on: February 20th, 2016 No Comments

Our ?chairman Sh. Gopal Lele ?at 83 years , not only attend to his ?factory , He too ?contributes to Global cause ?of “CLEAN ?ENVIRONMENT”?. ?He successfully ?developed ?a Bio Gas Plant ?for House Kitchen ?. ?It operates with food waste . ?A big thought and small initiative ?, If it can be implemented sincerely

Read More →

Power Distribution Board

Posted on: January 30th, 2016 No Comments

A ? ?10.30 L x2.1 H ?x 1.0 W ?meter ?Power Distribution Board panel under final assembly at our workshop. It consists of 2Nos. source ACB 3200 Amp , 21 nos. of ?outgoing feeders along with 2 nos of 1000 A, change over switch . A consistent Quality ?and ?Geometrical Symmetry is main feature. ?

Read More →

Quality system Audit

Posted on: January 23rd, 2016 No Comments

We are known for our Quality Products , Services and Work culture too. Quality system 9001:2008 Audit is being done for Renewal of Accreditation. Audit in Quality Assurance department for in- process ?panels ?quality checks is in view. ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?

Read More →

Energy optimization in Lighting / Safe working practices

Posted on: January 16th, 2016 No Comments

Earlier ?Flourescent light fitting with 4×54 watts was installed, Light intensity ?was ?400lux ?approximately . It was a matter ?of concern for the workmen .Creating stress on eyes of the workmen and ?sometimes leading to improper inspection of the job . ??New LED fitting of ?150 watts with a light output of ?650 lux app.

Read More →

Top